Showing posts with label GOVERNING SYSTEM. Show all posts
Showing posts with label GOVERNING SYSTEM. Show all posts

Saturday, 26 July 2014

250 MW KWU GOVERNING SYSTEM



In order to maintain the synchronous speed under changing load/grid or steam conditions, the KWU turbine supplied by BHEL at NTPC Korba is equipped with electro-hydraulic governor; fully backed-up by a hydraulic governor. The
measuring and processing of electrical signal offer the advantages such as flexibility, dynamic stability and simple representation of complicated